March 31, 20233 yr I was at the game-- There is a sign up that the museum is not opening till April 14th.
March 31, 20233 yr 6 minutes ago, Hough Rulz said: I was at the game-- There is a sign up that the museum is not opening till April 14th. WBC probably slowed down their work time on it
March 31, 20233 yr 1 minute ago, SonOfJack said: WBC probably slowed down their work time on it If only there was a way for them to have known when the season was going to start and when the WBC was going to happen...... it's too bad there was no way to know.
March 31, 20233 yr 28 minutes ago, SonOfJack said: WBC probably slowed down their work time on it Yeah, that's no excuse.
March 31, 20233 yr Author Thanks for the update guys. I live in Tampa and want to head down for a serious, but will wait until this is open.
March 31, 20233 yr 50 minutes ago, rmc523 said: Yeah, that's no excuse. Agreed. had all off-season to prepare.
March 31, 20233 yr 11 minutes ago, SonOfJack said: Agreed. had all off-season to prepare. Though to be fair, if permits were involved, the city of Miami is TERRIBLE and SLOWWWW. It's entirely possible they were held up by permits. I have a job now that has taken literal MONTHS to get through permitting, and we're just a sub-contractor, and it's a small job.
March 31, 20233 yr 30 minutes ago, SonOfJack said: Agreed. had all off-season to prepare. Blue Jays renovations are also not yet complete. They decided to let it go a little further because the Jays are starting with a 10 game road trip with two days off included [one to travel up to Toronto].
March 31, 20233 yr 2 hours ago, Hough Rulz said: If only there was a way for them to have known when the season was going to start and when the WBC was going to happen...... it's too bad there was no way to know.
March 31, 20233 yr 39 minutes ago, rmc523 said: Though to be fair, if permits were involved, the city of Miami is TERRIBLE and SLOWWWW. It's entirely possible they were held up by permits. I have a job now that has taken literal MONTHS to get through permitting, and we're just a sub-contractor, and it's a small job. What does this have to do with permits though? It's an unused corner of their existing building that they just need to populate with memorabilia than I'm assuming they already have in their possession.
March 31, 20233 yr 2 hours ago, Hough Rulz said: If only there was a way for them to have known when the season was going to start and when the WBC was going to happen...... it's too bad there was no way to know. Yep it is indeed too bad.
March 31, 20233 yr 57 minutes ago, Michael said: Blue Jays renovations are also not yet complete. They decided to let it go a little further because the Jays are starting with a 10 game road trip with two days off included [one to travel up to Toronto]. I think their renovations were a lot more involved than these, though. 34 minutes ago, SilverBullet said: What does this have to do with permits though? It's an unused corner of their existing building that they just need to populate with memorabilia than I'm assuming they already have in their possession. I said IF permits were involved.....they may not be, but I think it's likely they are. Stuff like this is not as simple as you think....and I doubt all they're doing is throwing a couple shelves up and calling it a day (or at least I hope not). It really depends on the extent of the changes made. This museum is supposed to be in the old taste of Miami area, right? So remember, originally there were 3-4 concession stands in there. To make the area larger for a museum (it was a narrow space with the concession stuff there) - that means all sorts of kitchen equipment, counters, etc. will need to be removed. They need permits for that. If new walls and electrical were put in, that stuff gets permitted. If there are new walls, that changes the fire sprinkler coverage (what my company does), and that requires permits. If HVAC (A/C) changed, that requires permits. In other words, any changes beyond painting at a public/commercial facility likely requires permits. And that stuff is usually subbed out, meaning there are several contractors involved, and several sub-permits under one master permit, so potentially several permits going through the process. Also, permits/work gets inspected, so if the permit for one thing is held up, that can have a domino effect of delays on the whole project. For example, the electrical I mentioned above....if there are new walls requiring new electrical, they can't close up the walls until that's been inspected. But if permits are held up, they can't inspect until those are approved, delaying everything. Edited March 31, 20233 yr by rmc523
April 1, 20233 yr 9 hours ago, flsportsfan83 said: Thanks for the update guys. I live in Tampa and want to head down for a serious, but will wait until this is open.