Skip to content
View in the app

A better way to browse. Learn more.

MarlinsBaseball.com

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Anyone go to the Marlins museum at the Park?

Featured Replies

1 minute ago, SonOfJack said:

WBC probably slowed down their work time on it

If only there was a way for them to have known when the season was going to start and when the WBC was going to happen...... it's too bad there was no way to know. 

28 minutes ago, SonOfJack said:

WBC probably slowed down their work time on it

Yeah, that's no excuse.

11 minutes ago, SonOfJack said:

Agreed. had all off-season to prepare.

 

Though to be fair, if permits were involved, the city of Miami is TERRIBLE and SLOWWWW.  It's entirely possible they were held up by permits.  I have a job now that has taken literal MONTHS to get through permitting, and we're just a sub-contractor, and it's a small job.

30 minutes ago, SonOfJack said:

Agreed. had all off-season to prepare.

Blue Jays renovations are also not yet complete. They decided to let it go a little further because the Jays are starting with a 10 game road trip with two days off included [one to travel up to Toronto].

2 hours ago, Hough Rulz said:

If only there was a way for them to have known when the season was going to start and when the WBC was going to happen...... it's too bad there was no way to know. 

Thats Good Robert Deniro GIF

39 minutes ago, rmc523 said:

 

Though to be fair, if permits were involved, the city of Miami is TERRIBLE and SLOWWWW.  It's entirely possible they were held up by permits.  I have a job now that has taken literal MONTHS to get through permitting, and we're just a sub-contractor, and it's a small job.

What does this have to do with permits though? It's an unused corner of their existing building that they just need to populate with memorabilia than I'm assuming they already have in their possession. 

57 minutes ago, Michael said:

Blue Jays renovations are also not yet complete. They decided to let it go a little further because the Jays are starting with a 10 game road trip with two days off included [one to travel up to Toronto].

I think their renovations were a lot more involved than these, though.

34 minutes ago, SilverBullet said:

What does this have to do with permits though? It's an unused corner of their existing building that they just need to populate with memorabilia than I'm assuming they already have in their possession. 

I said IF permits were involved.....they may not be, but I think it's likely they are.

Stuff like this is not as simple as you think....and I doubt all they're doing is throwing a couple shelves up and calling it a day (or at least I hope not).

It really depends on the extent of the changes made.  This museum is supposed to be in the old taste of Miami area, right?  So remember, originally there were 3-4 concession stands in there.  To make the area larger for a museum (it was a narrow space with the concession stuff there) - that means all sorts of kitchen equipment, counters, etc. will need to be removed.  They need permits for that.  If new walls and electrical were put in, that stuff gets permitted.  If there are new walls, that changes the fire sprinkler coverage (what my company does), and that requires permits.  If HVAC (A/C) changed, that requires permits.

In other words, any changes beyond painting at a public/commercial facility likely requires permits.  And that stuff is usually subbed out, meaning there are several contractors involved, and several sub-permits under one master permit, so potentially several permits going through the process.  Also, permits/work gets inspected, so if the permit for one thing is held up, that can have a domino effect of delays on the whole project.  For example, the electrical I mentioned above....if there are new walls requiring new electrical, they can't close up the walls until that's been inspected.  But if permits are held up, they can't inspect until those are approved, delaying everything.

Edited by rmc523

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...
Background Picker
Customize Layout

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.